New Water Meter Installations:
New water meter installations require payment in advance for the following:
Charge | Fee |
---|
Water Permit Residential | $100.00 |
Water Permit Commercial | $135.00 |
Administration Charge | $25.00 |
Effective 1/1/2011:
Connection Fees:
Meter Size | Water Meter Connection Fee |
---|
3/4-inch and smaller | $400.00 |
1-inch | $440.00 |
1-1/2-inch | $1445.00 (call for fire line fee) |
2-inch | $1,635.00 (call for fire line fee) |
Connection fee for a water meter installed by a contractor is $245.00.
Water Hydrant Meters are subject to a Water Permit Charge of $50.00, an Administration Charge of $25.00, and a $1,000.00 deposit. Effective January 1, 2013, hydrant meters are billed bi-monthly at a rate of $55.70, plus $1.95 per ccf over 1,000 cf. (Hydrant Application)